Image from OpenLibrary

Joint operation of the TSTA under the collaboration between JAERI and U.S.-DOE -Detail performance of the J-FCU [25 days extended TSTA loop operation on April-May 1992]-.

Material type: TextTextPublication details: [s.l.] : [s.n.], 1993.
Tags from this library: No tags from this library for this title. Log in to add tags.
Holdings
Item type Home library Call number Status Barcode
Books Books Centro de Información Eduardo Savino JAERI-M 93-084 (Browse shelf(Opens below)) Available 38540
Total holds: 0

There are no comments on this title.

to post a comment.